The Bald Mountain mine is owned and operated by Kinross’ wholly-owned subsidiary KG Mining (Bald Mountain) Inc. (“KGBMI”).
Summary:
Paleozoic through Tertiary rocks. The area is part of a corridor of northwest-southeast directed Tertiary extension in the Basin and Range province of Nevada. The study area is characterized by two north-trending uplifted blocks, the Bald Mountain-Buck Mountain Ridge on the west and Alligator Ridge on the east, separated by a fault valley that encompasses Mooney Basin, the Alligator Ridge deposits, and the Yankee and Vantage deposits.
The Bald Mountain Mining District falls along the southeastern extension of the Carlin trend (Nutt et al.2000). The district contains two separate but adjacent mineral trends: 1) the northwest-southeast Bida trend that parallels the Carlin trend; and 2) the Yankee-Alligator Ridge-Mooney Basin trend that follows the north-northeast trend of the structural basin between the Bald Mountain-Buck Mountain Ridge and Alligator Ridge. The geology of the district is quite complex and consists of a variety of reactivated folds and faults that serve to localize
Reserves & Resources at December 31, 2023
Mineral reserves estimate cut-off grade from 0.09 to 0.16 g/t Au.
Mineral resources are estimated using appropriate cut-off grades based on a gold price of $1,700.00 per ounce and a silver price of $21.30 per ounce.
Category | Tonnage | Commodity | Grade | Contained Metal |
Proven
|
745 kt
|
Gold
|
0.54 g/t
|
10 koz
|
Probable
|
32,264 kt
|
Gold
|
0.54 g/t
|
539 koz
|
Proven & Probable
|
33,008 kt
|
Gold
|
0.54 g/t
|
549 koz
|
Measured
|
9,042 kt
|
Gold
|
0.76 g/t
|
202 koz
|
Indicated
|
272,066 kt
|
Gold
|
0.54 g/t
|
3,937 koz
|
Measured & Indicated
|
281,108 kt
|
Gold
|
0.54 g/t
|
4,139 koz
|
Inferred
|
57,270 kt
|
Gold
|
0.33 g/t
|
549 koz
|
Summary:
e known reserves. Bald Mountain includes several other deposits scattered over the property, and three ROM heap leach pads (Bald Mountain, Mooney and Vantage).
Bald Mountain mine is mined using standard open pit methods including drilling, blasting and loading into haul trucks. Typical bench heights are 25 to 40 feet high and of variable width. Overall pit wall slope angles range from 30 to 55 degrees. Blasted ore and waste rock are loaded into haul trucks by front-end loaders or electric and hydraulic shovels. Ore is hauled to the run-of-mine (ROM) leach pad.
Heavy Mobile Equipment
HME Type | Model | Quantity |
Shovel
|
P&H 2800 XPC
|
2
|
Shovel
|
Hitachi EX5500
|
1
|
Shovel
|
Hitachi EX5600
|
1
|
Shovel
|
Hitachi EX3600
|
1
|
Truck (haul)
|
Komatsu 830E-AC
|
23
|
Truck (haul)
|
Caterpillar 785
|
9
|
Truck (haul)
|
Komatsu 830E D/C
|
5
|
Comminution
Crushers and Mills
Milling equipment has not been reported.
Beneficiation
- ROM/dump leach
- Carbon in column (CIC)
- Carbon adsorption
- Cyanide (reagent)
Summary:
on is shipped off-site for further processing and ultimate gold refining.
The heap leach operations are divided into three areas: Bald, Mooney (North, South and Deep South), and Vantage. Vantage is the newest of the areas and became operational during the recertification period. The carbon-in-column (CIC) processing plants include: Process Plant 2, Mooney North Plant, Mooney South Plant, and the Vantage Plant. The Vantage Plant utilizes an innovative vertical CIC process. All operations noted here are within the North Operations Area (NOA) except for the Vantage Complex which is in the South Operations Area (SOA).
The Bald Mountain Mine Area includes:
• Process Area #1 which is no longer in operation. This consisted of a leach pad, five process ponds and a process building. The facilities have been decommissioned and the ponds backfilled. The area is currently under reclamation.
• Process Area #2 includes leach pads (Bald Leach Pad (previously pads 2 through 4) and Leach Pad 5), Pregnant Sump (PS1), Overflow Pond (POF1) and Secondary Pond (P4), two pregnant solution ponds (P5 and P6), Barren Pond (P7), Carbon-in-Column (CIC) process plant and cyanide offloading facility. However, the leach pads are not being actively leached; cyanide has not been added to the leach pads in over 12 months. The leach pads continue to drain down and the CIC process is still operational.
The Mooney Basin Area includes three process areas:
• North Area Facility, comprising a leach pad (Original Pad and Expansion Pads I, II, and III), two process solution ponds, a storm/event pond, Carbon-in-Column (CIC) process plant and cyanide off-loading facility;
• South Area Facility, comprising Leach Pad 4, a process solution pond, a storm/event pond, a solution collection tank, CIC plant and cyanide off-loading facility.
• Deep South Area Facility, comprising Leach Pads 5 and 6, a process solution pond, one storm/event pond, and a solution collection tank. Pregnant solution from this facility is piped to the South Area CIC plant for processing.
Originally, the Mooney North and Mooney South Area facilities operated independently. Pregnant and barren solution lines were constructed that connected these facilities, allowing solution to be pumped between them as needed.
The construction of the Vantage Complex began in Quarter 1 2018. The Vantage Complex is in the South Operations Area, was commissioned in 2019, and consists of:
• A leach pad, a solution collection tank, a process solution pond, a storm/event pond, CIC process plant, two cyanide storage tanks, and a cyanide off-loading area.
Recoveries & Grades:
Commodity | Parameter | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 |
Gold Equivalent
|
Head Grade, g/t
| 0.42 | 0.51 | 0.51 | 0.51 | 0.42 | 0.43 | 0.8 | 0.64 |
Summary:
er the life of mine.
In 2022, three out of the six operating mines (50%) were located in regions characterized by water stress, Tasiast in Mauritania, La Coipa in Chile and Bald Mountain in Nevada, USA. In keeping with the company-wide water balance accounting methodology, Kinross includes precipitation captured in our water withdrawn calculations. While precipitation is captured at all three sites, only the Bald Mountain (one out of three sites) withdraws and consumes fresh water from source (groundwater).
Bald Mountain, located in Nevada, U.S.A., is within an area categorized as arid and low water use Kinross’ criteria for assessing water risk supports this classification. Bald Mountain is a heap leach operation and maintains a high water recycle rate, achieving a rate of 93% in 2023.
Commodity Production
Gold equivalent ounces produced decreased by 26%, compared to 2022, primarily due to the lower grades and timing of ounces recovered from the heap leach pads.
Commodity | Units | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 |
Gold Equivalent
|
oz
| 192,219 | 249,533 | 227,951 | 244,190 | 227,953 | 327,040 | 306,776 | 132,913 | |
Operational metrics
Metrics | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 |
Ore tonnes mined
| 20,631 kt | 18,203 kt | 20,742 kt | 18,967 kt | 15,560 kt | 22,828 kt | 19,039 kt | 8,834 kt |
Waste
| 50,237,854 t | 43,679,016 t | 41,821,687 t | 55,244,273 t | 55,023,286 t | 40,743,398 t | | |
Tonnes processed
| 20,624 kt | 18,152 kt | 20,742 kt | 18,967 kt | 16,219 kt | 22,061 kt | 19,039 kt | 8,834 kt |
Daily mining capacity
| | | | | | | | 215.5 kt |
Stripping / waste ratio
| | | | | | | | 2.3 |
Production Costs
| Commodity | Units | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 |
Cash costs (sold)
|
Gold Equivalent
|
USD
|
1,576 / oz
|
1,444 / oz
|
1,059 / oz
|
978.12 / oz
|
608.33 / oz
|
433.28 / oz
|
508.53 / oz
|
Cash costs
|
Gold
|
USD
|
|
|
|
|
|
|
|
All-in sustaining costs (AISC)
|
Gold
|
USD
|
|
|
|
|
|
|
|
Mine Financials
| Units | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 |
Sustaining costs
|
M USD
| 58 | 41.7 | 35.8 | 72.9 |
|
|
|
Capital expenditures
|
M USD
| 87.8 | 63.9 | 46 | 75.8 |
280.3
|
109.4
|
66.1
|
Revenue
|
M USD
| 276.9 | 305.8 | 278.9 | 294.1 |
281.7
|
319.9
|
295
|
Operating Income
|
M USD
| 13.9 | -12.2 | -145 | 40.8 |
9.8
|
80.8
|
59
|
Gross profit
|
M USD
| 24 | 1.5 | -137.6 | 54.6 |
39.1
|
95
|
57.7
|
Personnel
Job Title | Name | Profile | Ref. Date |
Health, Safety & Training Manager
|
Deanna Hall
|
|
Sep 13, 2024
|
VP and General Manager
|
Joseph Kemp
|
|
Sep 13, 2024
|
Employees | Contractors | Total Workforce | Year |
546
|
164
|
710
|
2023
|
592
|
167
|
759
|
2022
|
607
|
222
|
829
|
2021
|
591
|
194
|
785
|
2020
|
607
|
191
|
798
|
2019
|
578
|
499
|
1,077
|
2018
|
500
|
|
|
2016
|