Summary:
u, Au, and Mo deposits, such as the Miami-Inspiration and the Cu Resolution.
The area is built of igneous, metamorphic and sedimentary rocks of various ages from the early Proterozoic to the Tertiary.
The Carlota deposit is formed by the surface mineralization of copper oxides in the proterozoic Pinal Schist. Chrysocolla is a dominant ore mineral and usually occurs as coatings, crusts and filling in fractures and heavily desintegrated rock masses.
Reserves & Resources at December 31, 2014
Category | Tonnage | Commodity | Grade | Contained Metal |
Measured
|
1,436 kt
|
Copper
|
0.58 %
|
7,323 t
|
Indicated
|
4,271 kt
|
Copper
|
0.46 %
|
17,247 t
|
Measured & Indicated
|
5,707 kt
|
Copper
|
0.49 %
|
24,570 t
|
Inferred
|
186 kt
|
Copper
|
0.51 %
|
843 t
|
Summary:
.
In 2023, access to the Cactus open pit - Phase III was launched, enabling the extension of the mine life to 2027.
Heavy Mobile Equipment
Fleet data has not been reported.
Comminution
Crushers and Mills
Milling equipment has not been reported.
Beneficiation
- Sulfuric acid (reagent)
- Heap leach
- Solvent Extraction & Electrowinning
Summary:
he pregnant leach solution (PLS) is pumped out of the heap and after the initial mechanical cleaning is subjected to the SX process, followed by the EW electrowinning process. The end product is electrolytic copper in the form of cathodes.
Summary:
r. Rainwater that has been in contact with the mine is captured and then used in technological processes.
Commodity Production
Commodity | Units | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 |
Copper
|
kt
| 4.8 | 4.8 | 6 | 6.4 | 5.3 | 3.7 |
All production numbers are expressed as cathode.
Production Costs
Commodity production costs have not been reported.
Mine Financials
| Units | 2021 |
Revenue
|
M PLN
| 265.4 |
Pre-tax Income
|
M PLN
| 67.9 |
After-tax Income
|
M PLN
| 67.9 |
Operating Cash Flow
|
M PLN
| 8.5 |
Personnel
Job Title | Name | Profile | Ref. Date |
Environmental Manager
|
Mauricio Acevedo Vidal
|
|
Sep 2, 2024
|
General Manager
|
Brock Johnston
|
|
Sep 2, 2024
|
Sr. General Manger / Head of Operations
|
John Haynes
|
|
Sep 2, 2024
|
Employees | Year |
62
|
2023
|
65
|
2022
|
66
|
2021
|
69
|
2020
|
64
|
2019
|
56
|
2018
|