Carlota Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Copper
Mining Method
  • Truck & Shovel / Loader
Production Start2008
Mine Life2034
Snapshoton by the Carlota mine is by conventional methods typical for open-pit metals mines, i.e. the ore is mined by blasting and then is transported by haulage trucks. In 2023, access to the Cactus open pit - Phase III was launched, enabling the extension of the mine life to 2027.

As part of the 2023 process, the disposal of the Carlota mine was not finalised. As at 31 December 2023, the Carlota mine remains in KGHM's portfolio, conducts regular operations and is currently not classified as an asset held for sale.

Owners

SourceSource
CompanyInterestOwnership
KGHM Polska Miedz S.A. 100 % Indirect
Carlota Copper Company (operator) 100 % Direct

Deposit type

  • Porphyry

Summary:

u, Au, and Mo deposits, such as the Miami-Inspiration and the Cu Resolution.

The area is built of igneous, metamorphic and sedimentary rocks of various ages from the early Proterozoic to the Tertiary.

The Carlota deposit is formed by the surface mineralization of copper oxides in the proterozoic Pinal Schist. Chrysocolla is a dominant ore mineral and usually occurs as coatings, crusts and filling in fractures and heavily desintegrated rock masses.

Reserves & Resources at December 31, 2014

CategoryTonnage CommodityGradeContained Metal
Measured 1,436 kt Copper 0.58 % 7,323 t
Indicated 4,271 kt Copper 0.46 % 17,247 t
Measured & Indicated 5,707 kt Copper 0.49 % 24,570 t
Inferred 186 kt Copper 0.51 % 843 t

Mining

  • Truck & Shovel / Loader

Summary:

.

In 2023, access to the Cactus open pit - Phase III was launched, enabling the extension of the mine life to 2027.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Beneficiation

  • Sulfuric acid (reagent)
  • Heap leach
  • Solvent Extraction & Electrowinning

Summary:

he pregnant leach solution (PLS) is pumped out of the heap and after the initial mechanical cleaning is subjected to the SX process, followed by the EW electrowinning process. The end product is electrolytic copper in the form of cathodes.

Water Supply

Summary:

r. Rainwater that has been in contact with the mine is captured and then used in technological processes.

Commodity Production

CommodityUnits202320222021202020192018
Copper kt 4.84.866.45.33.7
All production numbers are expressed as cathode.

Production Costs

Commodity production costs have not been reported.

Mine Financials

Units2021
Revenue M PLN 265.4  
Pre-tax Income M PLN 67.9  
After-tax Income M PLN 67.9  
Operating Cash Flow M PLN 8.5  

Personnel

Mine Management

Job TitleNameProfileRef. Date
Environmental Manager Mauricio Acevedo Vidal LinkedIn Sep 2, 2024
General Manager Brock Johnston LinkedIn Sep 2, 2024
Sr. General Manger / Head of Operations John Haynes LinkedIn Sep 2, 2024

Workforce

EmployeesYear
62 2023
65 2022
66 2021
69 2020
64 2019
56 2018