Commodity 2
Lorem ipsum dolor sit amet consectetur. Iaculis morbi a purus donec faucibus condime...
September 20, 2024
Commodity
September 19, 2024
After Tax NPV5% of US$111 Million at US$2,100/oz Au price After Tax NPV5% of US$153 Million at Spot prices 1 Average annual production targeted at approx. 56,000 Gold Equivalent Ounces ("GEO") 2 Life of Mine Average annual
QUITO, Ecuador, Sept. 19, 2024 (GLOBE NEWSWIRE) -- Solaris Resources Inc . (TSX: SLS; NYSE: SLSR) (“Solaris” or the “Company”) is pleased to report assay results from its ongoing 60,000m 2024 drilling program that aims to target open extensions of m
Highlights: First assays from Long Pocket infill drilling return strong uranium mineralisation at shallow depths. Significant intersections include: LP24RC004 – 10m @ 606ppm U 3 O 8 from 6m depth, including 2m @ 1,726ppm U 3 O 8 from
Vancouver, British Columbia--(Newsfile Corp. - September 19, 2024) - Minaurum Gold Inc. (TSXV: MGG) (OTCQX: MMRGF) (FSE: 78M) ("Minaurum" or "the Company") is pleased to announce the results of the first 5 holes of the 2024 drill program to establish
After Tax NPV5% of US$111 Million at US$2,100/oz Au price After Tax NPV5% of US$153 Million at Spot prices 1 Average annual production targeted at approx. 56,000 Gold Equivalent Ounces ("GEO") 2 Life of Mine Average annual EBITDA of US$49 Million and FCF of US$25 Million LOM average EBITDA of US$64 Million and FCF of US$34 Million at Spot prices 1 Mine life of 5 years, from April 2024 based on existing Resources Average Cash Costs of US$866/oz; Avg AISC US$1,148/oz No Material Upfront Capital Expenditures required Updated Mineral Resource Estimate contains 490,000ozs of Measured and Indicated Resources and 121,150 ozs of Inferred Resources with potential upside from continued drilling & resource expansion Spot prices; A
September 13, 2024
September 13, 2024 05:29 PM Eastern Daylight Time VANCOUVER, British Columbia--( BUSINESS WIRE )-- Capstone Copper Corp. (“Capstone” or the “Company”) (TSX:CS) (ASX:CSC) has today filed on SEDAR+ a National Instrument 43-101 (“NI 43-101”) compliant technical report titled “Santo Domingo Project NI 43-101 Technical Report and Feasibility Study Update” for the updated Santo Domingo feasibility study announced on July 31, 2024. The Technical Report was prepared in accordance with Canadian Securities Administrator’s NI 43-101 Standards of Disclosure for Mineral Projects; and is available under the Company’s profile on SEDAR+ at www.sedarplus.ca and the Company’s web site at www.capstonecopper.com . About Capstone Copper Corp. Capstone Copper Corp. is an Americas-focused coppe
September 9, 2024
New PID - Oko West Gold Project All amounts are in USD unless stated otherwise After-tax NPV 5% of $1.4 billion , IRR of 21% and payback of 3.8 years at $1,950 /oz base case gold price (long-term consensus) After-tax NPV 5% of $2.5 billion , IRR of 31% and payback of 2.0 years at $2,500 /oz spot gold price Average annual gold production of 353,000 ounces at an AISC of $986 /oz for 12.7 years Startup capital cost of $936 million and sustaining capital of $537 million over the life of mine ESIA submission targeted by year end while progressing towards a Feasibility Study for Q1-2025 An average of 1,260 direct permanent jobs to be created from the Oko West Project BROSSARD, QC , Sept. 9, 2024 /CNW/ - G Mining Ventures Corp. (" GMIN " or the " Corporation ") (
August 6, 2024
After Tax NPV5% of US$111 Million at US$2,100/oz Au price After Tax NPV5% of US$153 Million at Spot prices 1 Average annual production targeted at approx. 56,000 Gold Equivalent Ounces ("GEO") 2 Life of Mine Average annual EBITDA of US$49 Million and FCF of US$25 Million LOM average EBITDA of US$64 Million and FCF of US$29 Million at Spot prices 1 Mine life of 5 years, from April 2024 based on existing Resources Average Cash Costs of US$863/oz; Avg AISC US$1,144/oz No Material Upfront Capital Expenditures required Updated Mineral Resource Estimate contains 490,000ozs of Measured and Indicated Resources and 121,150 ozs of Inferred Resources with potential upside from continued drilling & resource expansion 1. Spot prices; Au: US$2,400/oz a
July 31, 2024
July 31, 2024 06:03 PM Eastern Daylight Time VANCOUVER, British Columbia--( BUSINESS WIRE )-- Capstone Copper Corp. (“Capstone” or the “Company”) (TSX:CS) (ASX:CSC) today announced the results of an updated feasibility study (“FS”) for its 100%-owned, fully-permitted Santo Domingo copper-iron-gold project (“Santo Domingo” or the “Project”) in Region III, Chile, located 35 kilometres northeast of its 70%-owned Mantoverde mine. “The release of the updated feasibility study for our Santo Domingo Project marks a major step towards the creation of a world-class district in the Atacama region of Chile. We have optimized the mine plan, updated the capital and operating cost estimates, and incorporated all experience gained throughout the engineering and construction of our nearby Mantove
June 18, 2024
VANCOUVER, British Columbia, June 18, 2024 (GLOBE NEWSWIRE) -- B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) (“B2Gold” or the “Company”) is pleased to announce the results of a positive Preliminary Economic Assessment (“PEA”) prepared in accordance with National Instrument 43-101 (“NI 43-101”) on its 100% owned Gramalote gold project located in the Department of Antioquia, Colombia (the “Gramalote Project”). All dollar figures are in United States dollars unless otherwise indicated. Highlights Significant gold production profile with low-cost structure and favorable metallurgical characteristics Open pit gold mine with an initial life of mine of 10 years, with mill processing over 12.5 years (“Life of Project”) Average grade processed of 1.26 grams per tonne (“g/t”) gold